LogoArena
Aerial view of a completed stadium at golden hour with glowing field lights
Macro close-up of perforated aluminum façade cladding on a sports arena
Cross-section architectural rendering of a stadium seating bowl
Athletes mid-motion inside a modern finished aquatic facility
Construction crane silhouetted against a dramatic dusk sky over a stadium site
Seating bowl geometry detail showing curved concrete tiers in an empty stadium
Exterior elevation of a contemporary sports arena at twilight
Packed stadium crowd at game night with floodlights blazing

Sports Facility Architecture

Architecture
at Scale

Signature Projects

Three Venues.
Three Scales.
One Standard.

Meridian Stadium aerial view showing cantilevered concrete bowl at golden hour, Columbus Ohio
01NCAA Division I Football

Meridian Stadium

A cantilevered concrete bowl suspended over a ravine — the roof's tension cable geometry became the city's new civic symbol. Designed to accommodate 72,400 for football and reconfigure to 48,000 for concerts within 6 hours.

Columbus, Ohio
Capacity72,400
Completed2023
Investment$890M
Vantage Arena exterior showing perforated weathering steel facade in Portland Oregon at dusk
02NBA / NHL Multi-Use

Vantage Arena

A 19,800-seat arena wrapped in perforated weathering steel that oxidizes differently on each façade — the building's color changes with the Pacific light. Structural grid doubles as a wayfinding system legible from three miles.

Portland, Oregon
Capacity19,800
Completed2021
Investment$620M
Halcyon Natatorium interior showing Olympic competition pool with retractable roof open, Austin Texas
03Olympic Training + Collegiate

Halcyon Natatorium

The first 50m competition pool in the Southwest designed for both Olympic trials and Big 12 conference meets. The retractable roof opens in 4 minutes — the same time a world-record 400m IM takes.

Austin, Texas
Capacity4,200
Completed2022
Investment$180M
Venues Completed47
Seats Built2.4M+
States + Countries31
Avg. Project Value$380M

Five Typologies

Every Venue Category.
One Firm.

Large football stadium seating bowl at dusk with lights illuminating the field

Stadium

Football, soccer, and multi-use bowls from 40,000 to 110,000 seats

40K – 110K seats
Modern indoor arena interior with basketball court and tiered seating

Arena

NBA, NHL, and mixed-use arenas with adaptable floor configurations

15K – 22K seats
Olympic aquatic center interior with competition pool and starting blocks

Aquatic Center

Olympic 50m pools and collegiate natatoriums with retractable roof systems

2K – 8K seats
Indoor velodrome showing steeply banked wooden cycling track curves

Velodrome

UCI-certified wooden and concrete velodromes for elite and community cycling

3K – 6K seats
High-performance athletic training facility with weight room and recovery center

Training Complex

Elite athlete performance facilities with integrated sport science labs

Custom programs

The Process

From Master Plan
to Game Night —
Six Descents.

Aerial master plan view showing stadium site and surrounding urban context at 3000 feet
01
Altitude: 3,000 ft

Master Plan

Site as Civic Anchor

Every Arena project begins at the city scale. We map transit corridors, sightlines from the highway, and the pedestrian approach from four directions. The stadium is not a building placed on a site — it is a site reorganized around a building.

Exterior elevation of stadium facade showing perforated steel cladding and tension cable system
02
Altitude: 400 ft

Exterior Elevation

The Silhouette Earns Its Place

The façade must read at three scales simultaneously: the highway approach at 60mph, the pedestrian plaza at walking pace, and the close-up hand-touch of cladding material. Perforated steel, pre-cast concrete, and tension cable create depth that flat surfaces cannot.

Interior bowl perspective showing tiered seating geometry and field sightlines from upper deck
03
Altitude: 80 ft

Bowl Perspective

The Geometry of Anticipation

Sightline calculations govern every tier angle. The closest seat is 42 feet from the field. The farthest is 312 feet — but the bowl geometry makes it feel 200. Acoustic reflectors suspended from the roof structure direct the crowd's roar back onto the field.

Material close-up of exposed post-tensioned concrete and hot-rolled steel connection detail
04
Altitude: 4 ft

Material Detail

Cold, Engineered, Monumental

Exposed post-tensioned concrete. Hot-rolled structural steel with mill-scale finish. Perforated aluminum with 18% open area. These are not decorative choices — they are structural decisions made visible. The material palette is the architecture.

Construction site showing steel structure rising against sky with cranes and formwork
05
Time: 18 Months

Construction

Structure Before Skin

Our construction administration team is on-site weekly. Not to inspect — to problem-solve. When a post-tensioning sequence needs adjustment at 3am before a concrete pour, our structural engineer picks up the phone. We have never missed a scheduled opening.

Packed stadium on game night with floodlights blazing and crowd filling every seat
06
Time: Opening Night

Game Night

The Building Performs

The design is complete when 68,000 people arrive and the building disappears. The crowd, the light, the noise — that is the architecture. We design the vessel for an experience that transcends the vessel. That is the standard we hold every project to.

Clients

Athletic Directors.
Bond Committees.
Franchise Owners.

+4 Five-Star Recruits / Class

Arena didn't just design a stadium. They designed a recruiting tool. We went from three five-star commitments per class to seven in the first cycle after opening. The facility closed deals we couldn't close with words.

Marcus Ellison

Director of Athletics

Midwestern State University

Meridian Stadium — 72,400 seats — Columbus, OH

71–29 Bond Vote

The bond committee passed 71–29. That hasn't happened in this city in twenty years. Arena's renderings and the public engagement process they ran turned skeptics into advocates. The building's silhouette is on our city's homepage now.

Patricia Okonkwo

Chair, Municipal Infrastructure Commission

City of Portland, Oregon

Vantage Arena — 19,800 seats — Portland, OR

$620M Project Value

We gave Arena a brief that said "iconic." Most firms nod and deliver competent. Arena came back with a building that looks like it was always supposed to be there — and didn't exist until they drew it. That's the difference.

James Rutherford

President & Governor

Western Conference NBA Franchise

Undisclosed Project — 21,200 seats

Trusted by

NCAA Division IBig Ten ConferenceNBANHLMLSOlympic CommitteeMunicipal Authorities